GroupGets LLC ORANGECRAB-R0D2-85
ORANGECRAB R0.2.1 85F - LATTICE
Answer first: this page is a purchasing reference for the exact part number ORANGECRAB-R0D2-85 from GroupGets LLC. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | ORANGECRAB-R0D2-85 |
|---|---|
| Manufacturer | GroupGets LLC |
| Category | Embedded Complex Logic (FPGA, CPLD) Evaluation Boards |
| series | ECP5 |
| packaging | Box |
| product status | Active |
| param 1 | FPGA |
| param 2 | LFE5U-85F |
| param 3 | ECP5 FPGA OrangeCrab-r0d2-85 |
| param 4 | Board(s) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify ORANGECRAB-R0D2-85 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For ORANGECRAB-R0D2-85, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.