Infineon Technologies 98-0255
IC GATE DRVR HALF-BRIDGE 14DIP
Answer first: this page is a purchasing reference for the exact part number 98-0255 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 98-0255 |
|---|---|
| Manufacturer | Infineon Technologies |
| Category | Gate Drivers |
| package | 14-DIP (0.300", 7.62mm) |
| series | - |
| packaging | Tube |
| product status | Obsolete |
| param 1 | Not Verified |
| param 2 | Half-Bridge |
| param 3 | Independent |
| param 4 | 2 |
| param 5 | IGBT, N-Channel MOSFET |
| param 6 | 10V ~ 20V |
| param 7 | 0.8V, 2.9V |
| param 8 | 200mA, 350mA |
| param 9 | Non-Inverting |
| param 10 | 600 V |
| param 11 | 150ns, 50ns |
| param 12 | -40°C ~ 150°C (TJ) |
| param 13 | - |
| param 14 | - |
| param 15 | Through Hole |
| param 16 | 14-DIP |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 98-0255 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 98-0255, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.