Home / Products / IGBT Modules / Infineon Technologies / FF225R65T3E3P3BPMA1

Infineon Technologies FF225R65T3E3P3BPMA1

IHV IHM T XHP 3 3-6 5K AG-XHP3K6

Answer first: this page is a purchasing reference for the exact part number FF225R65T3E3P3BPMA1 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: IGBT Modules Part number: FF225R65T3E3P3BPMA1 Package: Module RFQ verification required

Key Parameters

Part NumberFF225R65T3E3P3BPMA1
ManufacturerInfineon Technologies
CategoryIGBT Modules
packageModule
seriesXHP™3
packagingTray
product statusActive
param 1Trench Field Stop
param 22 Independent
param 35900 V
param 4225 A
param 51000 W
param 63.4V @ 15V, 225A
param 75 mA
param 865.6 nF @ 25 V
param 9Standard
param 10No
param 11125°C (TJ)
param 12Chassis Mount
param 13AG-XHP3K65

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify FF225R65T3E3P3BPMA1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For FF225R65T3E3P3BPMA1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.