Home / Products / FETs, MOSFETs / Infineon Technologies / IPB034N06N3GATMA1

Infineon Technologies IPB034N06N3GATMA1

MOSFET N-CH 60V 100A TO263-7

Answer first: this page is a purchasing reference for the exact part number IPB034N06N3GATMA1 from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: FETs, MOSFETs Part number: IPB034N06N3GATMA1 Package: TO-263-7, D2PAK (6 Leads + Tab) RFQ verification required

Key Parameters

Part NumberIPB034N06N3GATMA1
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
packageTO-263-7, D2PAK (6 Leads + Tab)
seriesOptiMOS™
packagingTape & Reel (TR)
product statusObsolete
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 360 V
param 4100A (Tc)
param 510V
param 63.4mOhm @ 100A, 10V
param 74V @ 93µA
param 8130 nC @ 10 V
param 9±20V
param 1011000 pF @ 30 V
param 11-
param 12167W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17PG-TO263-7

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IPB034N06N3GATMA1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IPB034N06N3GATMA1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.