Home / Products / Infineon Technologies / IPB120N06NG

Infineon Technologies IPB120N06NG

MOSFET N-CH 60V 75A D2PAK

Answer first: this page is a purchasing reference for the exact part number IPB120N06NG from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Part number: IPB120N06NG Package: TO-263-3, D2PAK (2 Leads + Tab), TO-263AB RFQ verification required

Key Parameters

Part NumberIPB120N06NG
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
packageTO-263-3, D2PAK (2 Leads + Tab), TO-263AB
seriesOptiMOS™
packagingTape & Reel (TR)
product statusObsolete
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 360 V
param 475A (Tc)
param 510V
param 611.7mOhm @ 75A, 10V
param 74V @ 94µA
param 862 nC @ 10 V
param 9±20V
param 102100 pF @ 30 V
param 11-
param 12158W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17PG-TO263-3

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IPB120N06NG Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IPB120N06NG, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.