Home / Products / FETs, MOSFETs / Infineon Technologies / IRFP7718PBF

Infineon Technologies IRFP7718PBF

MOSFET N-CH 75V 195A TO247AC

Answer first: this page is a purchasing reference for the exact part number IRFP7718PBF from Infineon Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Infineon Technologies Category: FETs, MOSFETs Part number: IRFP7718PBF Package: TO-247-3 RFQ verification required

Key Parameters

Part NumberIRFP7718PBF
ManufacturerInfineon Technologies
CategoryFETs, MOSFETs
packageTO-247-3
seriesHEXFET®, StrongIRFETâ„¢
packagingTube
product statusObsolete
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 375 V
param 4195A (Tc)
param 56V, 10V
param 61.8mOhm @ 100A, 10V
param 73.7V @ 250µA
param 8830 nC @ 10 V
param 9±20V
param 1029550 pF @ 25 V
param 11-
param 12517W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14-
param 15-
param 16Through Hole
param 17TO-247AC

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IRFP7718PBF Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IRFP7718PBF, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.