Home / Products / D-Sub Connector Assemblies / JAE Electronics / D02-M15SAG-21L9E

JAE Electronics D02-M15SAG-21L9E

CONN D-SUB HD RCPT 15P R/A SLDR

Answer first: this page is a purchasing reference for the exact part number D02-M15SAG-21L9E from JAE Electronics. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: JAE Electronics Category: D-Sub Connector Assemblies Part number: D02-M15SAG-21L9E Package: RFQ verification required

Key Parameters

Part NumberD02-M15SAG-21L9E
ManufacturerJAE Electronics
CategoryD-Sub Connector Assemblies
seriesD02
packagingBag
product statusActive
param 1D-Sub, High Density
param 2Receptacle, Female Sockets
param 315
param 43
param 5Through Hole, Right Angle
param 61 (DE, E) High Density
param 7Signal
param 8Board Side (4-40)
param 9Solder
param 10-
param 11-
param 12-
param 13-
param 14-
param 15UL94 V-0
param 163A
param 170.350" (8.89mm)
param 18Board Lock

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify D02-M15SAG-21L9E Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For D02-M15SAG-21L9E, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.