Home / Products / FETs, MOSFETs / Littelfuse Inc. / IXFA4N100P

Littelfuse Inc. IXFA4N100P

MOSFET N-CH 1000V 4A TO263

Answer first: this page is a purchasing reference for the exact part number IXFA4N100P from Littelfuse Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Littelfuse Inc. Category: FETs, MOSFETs Part number: IXFA4N100P Package: TO-263-3, D2PAK (2 Leads + Tab), TO-263AB RFQ verification required

Key Parameters

Part NumberIXFA4N100P
ManufacturerLittelfuse Inc.
CategoryFETs, MOSFETs
packageTO-263-3, D2PAK (2 Leads + Tab), TO-263AB
seriesHiPerFETâ„¢, Polar
packagingTube
product statusActive
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 31000 V
param 44A (Tc)
param 510V
param 63.3Ohm @ 2A, 10V
param 75V @ 250µA
param 826 nC @ 10 V
param 9±20V
param 101456 pF @ 25 V
param 11-
param 12150W (Tc)
param 13-55°C ~ 150°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17TO-263AA (IXFA)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify IXFA4N100P Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For IXFA4N100P, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.