Home / Products / AC Fans / Mechatronics Fan Group / LPC12A99-BTER-B1+6

Mechatronics Fan Group LPC12A99-BTER-B1+6

FAN AXIAL 120X38MM 90-264VAC

Answer first: this page is a purchasing reference for the exact part number LPC12A99-BTER-B1+6 from Mechatronics Fan Group. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Mechatronics Fan Group Category: AC Fans Part number: LPC12A99-BTER-B1+6 Package: RFQ verification required

Key Parameters

Part NumberLPC12A99-BTER-B1+6
ManufacturerMechatronics Fan Group
CategoryAC Fans
seriesLPC12A
packagingBulk
product statusObsolete
param 190 ~ 264VAC
param 2Square - 120mm L x 120mm H
param 338.00mm
param 4140.0 CFM (3.92m³/min)
param 50.440 in H2O (109.6 Pa)
param 6Ball
param 7Tubeaxial
param 8Electronic Commutation (EC), PWM Control, Speed Sensor (Tach)
param 956.0dB(A)
param 1012.00W
param 114000 RPM
param 124 Terminals
param 13-
param 14-40 ~ 158°F (-40 ~ 70°C)
param 15-
param 160.816 lb (370.13 g)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LPC12A99-BTER-B1+6 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LPC12A99-BTER-B1+6, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.