Home / Products / Real Time Clocks / Microchip Technology / MCP79410T-I/MNY

Microchip Technology MCP79410T-I/MNY

IC RTC CLK/CALENDAR I2C 8TDFN

Answer first: this page is a purchasing reference for the exact part number MCP79410T-I/MNY from Microchip Technology. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Microchip Technology Category: Real Time Clocks Part number: MCP79410T-I/MNY Package: 8-WFDFN Exposed Pad RFQ verification required

Key Parameters

Part NumberMCP79410T-I/MNY
ManufacturerMicrochip Technology
CategoryReal Time Clocks
package8-WFDFN Exposed Pad
series-
packagingTape & Reel (TR)
product statusActive
param 1Not Verified
param 2Clock/Calendar
param 3Alarm, Leap Year, Square Wave Output, SRAM, Unique ID
param 464B, 1Kb
param 5HH:MM:SS (12/24 hr)
param 6YY-MM-DD-dd
param 7I2C, 2-Wire Serial
param 81.8V ~ 5.5V
param 91.3V ~ 5.5V
param 101.2µA @ 3.3V
param 11-40°C ~ 85°C
param 12Surface Mount
param 13-
param 14-
param 158-TDFN (2x3)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MCP79410T-I/MNY Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MCP79410T-I/MNY, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.