Mill-Max Manufacturing Corp. 5084-0-18-80-34-27-10-0
STD. CONNECTOR JACK RECEPTACLE
Answer first: this page is a purchasing reference for the exact part number 5084-0-18-80-34-27-10-0 from Mill-Max Manufacturing Corp.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 5084-0-18-80-34-27-10-0 |
|---|---|
| Manufacturer | Mill-Max Manufacturing Corp. |
| Category | PC Pin Receptacles, Socket Connectors |
| series | 5084 |
| packaging | Bulk |
| product status | Active |
| param 1 | Solder Cup |
| param 2 | Press-Fit |
| param 3 | 0.433" (11.00mm) |
| param 4 | 0.032" ~ 0.046" (0.81mm ~ 1.17mm) |
| param 5 | - |
| param 6 | 0.064" (1.63mm) |
| param 7 | 0.081" (2.06mm) |
| param 8 | 0.093" (2.36mm) |
| param 9 | - |
| param 10 | 0.220" (5.59mm) |
| param 11 | Beryllium Copper |
| param 12 | Gold |
| param 13 | 30.0µin (0.76µm) |
| param 14 | - |
| param 15 | - |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 5084-0-18-80-34-27-10-0 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 5084-0-18-80-34-27-10-0, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.