Mini-Circuits ZMSCQ-2-180+
90 HYBRID, 120 - 180 MHZ, 50
Answer first: this page is a purchasing reference for the exact part number ZMSCQ-2-180+ from Mini-Circuits. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | ZMSCQ-2-180+ |
|---|---|
| Manufacturer | Mini-Circuits |
| Category | RF Power Dividers/Splitters |
| package | Module |
| series | - |
| packaging | Tray |
| product status | Active |
| param 1 | 0.3dB |
| param 2 | 120 MHz ~ 180 MHz |
| param 3 | Isolation (Min) 15dB, 4° Imbalance (Max) |
| param 4 | 1.500" L x 1.130" W x 1.000" H (38.10mm x 28.70mm x 25.40mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify ZMSCQ-2-180+ Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For ZMSCQ-2-180+, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.