Home / Products / AC DC Converters, Offline Switches / Monolithic Power Systems Inc. / MP023GS

Monolithic Power Systems Inc. MP023GS

PRIMARY-SIDE CC/CV CONTROLLER

Answer first: this page is a purchasing reference for the exact part number MP023GS from Monolithic Power Systems Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Monolithic Power Systems Inc. Category: AC DC Converters, Offline Switches Part number: MP023GS Package: 8-SOIC (0.154", 3.90mm Width), 7 Leads RFQ verification required

Key Parameters

Part NumberMP023GS
ManufacturerMonolithic Power Systems Inc.
CategoryAC DC Converters, Offline Switches
package8-SOIC (0.154", 3.90mm Width), 7 Leads
series-
packagingTube
product statusActive
param 1Isolated
param 2No
param 3-
param 4Flyback
param 519.4 V
param 610V ~ 25V
param 7-
param 872Hz ~ 40kHz
param 9-
param 10Open Loop, Over Load, Over Temperature, Over Voltage
param 11-
param 12-40°C ~ 125°C (TJ)
param 13-
param 14-
param 158-SOIC-7A
param 16Surface Mount

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MP023GS Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MP023GS, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.