Home / Products / LED COBs, Engines, Modules, Strips / New Energy / XPEBAM-L1-0000-00901-SB01

New Energy XPEBAM-L1-0000-00901-SB01

LED MOD XLAMP AMBER STARBOARD

Answer first: this page is a purchasing reference for the exact part number XPEBAM-L1-0000-00901-SB01 from New Energy. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: New Energy Category: LED COBs, Engines, Modules, Strips Part number: XPEBAM-L1-0000-00901-SB01 Package: RFQ verification required

Key Parameters

Part NumberXPEBAM-L1-0000-00901-SB01
ManufacturerNew Energy
CategoryLED COBs, Engines, Modules, Strips
seriesXLamp® XP-E2
packagingTray
product statusNot For New Designs
param 1LED Module
param 2Amber
param 3-
param 4590nm (585nm ~ 595nm)
param 5Starboard
param 684lm (81lm ~ 87lm)
param 7350mA
param 825°C
param 92.2V
param 10109 lm/W
param 111A
param 12-
param 13130°
param 14-
param 1519.89mm Dia
param 16-
param 17-
param 18Domed

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify XPEBAM-L1-0000-00901-SB01 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For XPEBAM-L1-0000-00901-SB01, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.