Home / Products / FETs, MOSFETs / Nexperia USA Inc. / BUK9M12-60EX

Nexperia USA Inc. BUK9M12-60EX

MOSFET N-CH 60V 54A LFPAK33

Answer first: this page is a purchasing reference for the exact part number BUK9M12-60EX from Nexperia USA Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Nexperia USA Inc. Category: FETs, MOSFETs Part number: BUK9M12-60EX Package: SOT-1210, 8-LFPAK33 (5-Lead) RFQ verification required

Key Parameters

Part NumberBUK9M12-60EX
ManufacturerNexperia USA Inc.
CategoryFETs, MOSFETs
packageSOT-1210, 8-LFPAK33 (5-Lead)
seriesTrenchMOS™
packagingTape & Reel (TR)
product statusActive
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 360 V
param 454A (Tc)
param 55V
param 611mOhm @ 15A, 10V
param 72.1V @ 1mA
param 8-
param 9±10V
param 102769 pF @ 25 V
param 11-
param 1279W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14Automotive
param 15AEC-Q101
param 16Surface Mount
param 17LFPAK33

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BUK9M12-60EX Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BUK9M12-60EX, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.