Home / Products / Educational Kits / Pi-Top / PCUXGR100002

Pi-Top PCUXGR100002

PI-TOPCEED -US PLUG

Answer first: this page is a purchasing reference for the exact part number PCUXGR100002 from Pi-Top. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Pi-Top Category: Educational Kits Part number: PCUXGR100002 Package: RFQ verification required

Key Parameters

Part NumberPCUXGR100002
ManufacturerPi-Top
CategoryEducational Kits
seriespi-topCEED
packagingBox
product statusObsolete
param 1Starter Kit
param 2Computer Kit
param 3Raspberry Pi HAT (40 pin)
param 4-
param 5-
param 6-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify PCUXGR100002 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For PCUXGR100002, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.