Home / Products / AC DC Converters, Offline Switches / Power Integrations / TOP221G

Power Integrations TOP221G

IC OFFLINE SWITCH MULT TOP 8SMD

Answer first: this page is a purchasing reference for the exact part number TOP221G from Power Integrations. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Power Integrations Category: AC DC Converters, Offline Switches Part number: TOP221G Package: 8-SMD, Gull Wing RFQ verification required

Key Parameters

Part NumberTOP221G
ManufacturerPower Integrations
CategoryAC DC Converters, Offline Switches
package8-SMD, Gull Wing
seriesTOPSwitch®-II
packagingTube
product statusObsolete
param 1Isolated
param 2Yes
param 3700V
param 4Boost, Buck, Flyback, Forward
param 5-
param 6-
param 767%
param 8100kHz
param 99 W
param 10Current Limiting, Over Temperature
param 11-
param 12-40°C ~ 150°C (TJ)
param 13-
param 14-
param 158-SMD
param 16Surface Mount

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify TOP221G Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For TOP221G, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.