Home / Products / FETs, MOSFETs / Qorvo / UJ3C065080B3

Qorvo UJ3C065080B3

MOSFET N-CH 650V 25A TO263

Answer first: this page is a purchasing reference for the exact part number UJ3C065080B3 from Qorvo. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Qorvo Category: FETs, MOSFETs Part number: UJ3C065080B3 Package: TO-263-3, D2PAK (2 Leads + Tab), TO-263AB RFQ verification required

Key Parameters

Part NumberUJ3C065080B3
ManufacturerQorvo
CategoryFETs, MOSFETs
packageTO-263-3, D2PAK (2 Leads + Tab), TO-263AB
series-
packagingTape & Reel (TR)
product statusActive
param 1N-Channel
param 2-
param 3650 V
param 425A (Tc)
param 512V
param 6111mOhm @ 20A, 12V
param 76V @ 10mA
param 851 nC @ 15 V
param 9±25V
param 101500 pF @ 100 V
param 11-
param 12115W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17TO-263 (D2PAK)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify UJ3C065080B3 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For UJ3C065080B3, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.