Home / Products / Thermostats - Solid State / Rohm Semiconductor / BDE0600G-TR

Rohm Semiconductor BDE0600G-TR

THERMOSTAT 60DEGC ACT LOW 5SSOP

Answer first: this page is a purchasing reference for the exact part number BDE0600G-TR from Rohm Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Rohm Semiconductor Category: Thermostats - Solid State Part number: BDE0600G-TR Package: SC-74A, SOT-753 RFQ verification required

Key Parameters

Part NumberBDE0600G-TR
ManufacturerRohm Semiconductor
CategoryThermostats - Solid State
packageSC-74A, SOT-753
series-
packagingTape & Reel (TR)
product statusLast Time Buy
param 1Hot
param 260°C
param 3±4°C
param 45mA
param 5Open Drain
param 6Active Low
param 7/OverTemp, VTemp
param 8No
param 9-
param 102.9 V ~ 5.5 V
param 1116µA
param 12-30°C ~ 130°C
param 13Surface Mount
param 14-
param 15-
param 165-SSOP

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BDE0600G-TR Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BDE0600G-TR, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.