Home / Products / Motor Drivers, Controllers / Rohm Semiconductor / BM6209FS-E2

Rohm Semiconductor BM6209FS-E2

IC MOTOR DVR 3PH BRUSHLSS 54SSOP

Answer first: this page is a purchasing reference for the exact part number BM6209FS-E2 from Rohm Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Rohm Semiconductor Category: Motor Drivers, Controllers Part number: BM6209FS-E2 Package: 54-SOP (0.449", 11.40mm Width), 36 Leads RFQ verification required

Key Parameters

Part NumberBM6209FS-E2
ManufacturerRohm Semiconductor
CategoryMotor Drivers, Controllers
package54-SOP (0.449", 11.40mm Width), 36 Leads
series-
packagingTape & Reel (TR)
product statusObsolete
param 1Multiphase
param 2Brushless DC (BLDC)
param 3Driver - Fully Integrated, Control and Power Stage
param 4Half Bridge (3)
param 5Logic
param 6NMOS
param 7-
param 8Fan Motor Driver
param 92.5A
param 1013.5V ~ 400V
param 11600V
param 12-20°C ~ 100°C
param 13-
param 14-
param 15Surface Mount
param 16SSOP-A54_36

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BM6209FS-E2 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BM6209FS-E2, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.