Home / Products / FETs, MOSFETs / Rohm Semiconductor / RQ6L020SPTCR

Rohm Semiconductor RQ6L020SPTCR

MOSFET P-CH 60V 2A TSMT6

Answer first: this page is a purchasing reference for the exact part number RQ6L020SPTCR from Rohm Semiconductor. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Rohm Semiconductor Category: FETs, MOSFETs Part number: RQ6L020SPTCR Package: SOT-23-6 Thin, TSOT-23-6 RFQ verification required

Key Parameters

Part NumberRQ6L020SPTCR
ManufacturerRohm Semiconductor
CategoryFETs, MOSFETs
packageSOT-23-6 Thin, TSOT-23-6
series-
packagingTape & Reel (TR)
product statusActive
param 1P-Channel
param 2MOSFET (Metal Oxide)
param 360 V
param 42A (Ta)
param 54V, 10V
param 6210mOhm @ 2A, 10V
param 73V @ 1mA
param 87.2 nC @ 5 V
param 9±20V
param 10750 pF @ 10 V
param 11-
param 121.25W (Ta)
param 13150°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17TSMT6 (SC-95)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify RQ6L020SPTCR Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For RQ6L020SPTCR, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.