Home / Products / Application Specific Clock/Timing / Semtech Corporation / ACS8530T

Semtech Corporation ACS8530T

IC SETS TIMER SONET 100LQFP

Answer first: this page is a purchasing reference for the exact part number ACS8530T from Semtech Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Semtech Corporation Category: Application Specific Clock/Timing Part number: ACS8530T Package: 100-LQFP RFQ verification required

Key Parameters

Part NumberACS8530T
ManufacturerSemtech Corporation
CategoryApplication Specific Clock/Timing
package100-LQFP
series-
packagingTray
product statusObsolete
param 1Not Verified
param 2Yes
param 3SONET/SDH, Stratum
param 4TTL
param 5CMOS, TTL
param 62
param 714:11
param 8Yes/Yes
param 9311.04MHz
param 103V ~ 3.6V
param 11-40°C ~ 85°C (TA)
param 12Surface Mount
param 13-
param 14-
param 15100-LQFP (14x14)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify ACS8530T Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For ACS8530T, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.