Semtech Corporation SET111404
DIODE GEN PURP 400V 45A MODULE
Answer first: this page is a purchasing reference for the exact part number SET111404 from Semtech Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | SET111404 |
|---|---|
| Manufacturer | Semtech Corporation |
| Category | Single Diodes |
| package | Module |
| series | - |
| packaging | Bulk |
| product status | Discontinued at Digi-Key |
| param 1 | Standard |
| param 2 | 400 V |
| param 3 | 45A |
| param 4 | 1.5 V @ 9 A |
| param 5 | Fast Recovery =< 500ns, > 200mA (Io) |
| param 6 | 150 ns |
| param 7 | 3 µA @ 400 V |
| param 8 | - |
| param 9 | - |
| param 10 | - |
| param 11 | Solder |
| param 12 | - |
| param 13 | -55°C ~ 150°C |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify SET111404 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For SET111404, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.