Home / Products / SCRs / STMicroelectronics / TN2540-600G

STMicroelectronics TN2540-600G

SCR 600V 25A D2PAK

Answer first: this page is a purchasing reference for the exact part number TN2540-600G from STMicroelectronics. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: STMicroelectronics Category: SCRs Part number: TN2540-600G Package: TO-263-3, D2PAK (2 Leads + Tab), TO-263AB RFQ verification required

Key Parameters

Part NumberTN2540-600G
ManufacturerSTMicroelectronics
CategorySCRs
packageTO-263-3, D2PAK (2 Leads + Tab), TO-263AB
series-
packagingTube
product statusObsolete
param 1600 V
param 21.3 V
param 340 mA
param 41.6 V
param 516 A
param 625 A
param 750 mA
param 85 µA
param 9300A, 314A
param 10Standard Recovery
param 11-40°C ~ 125°C
param 12-
param 13-
param 14Surface Mount
param 15D2PAK

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify TN2540-600G Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For TN2540-600G, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.