Home / Products / Common Mode Chokes / TDK Corporation / MCZ1210AH900L2TA0G

TDK Corporation MCZ1210AH900L2TA0G

CMC 100MA 2LN 90 OHM SMD

Answer first: this page is a purchasing reference for the exact part number MCZ1210AH900L2TA0G from TDK Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: TDK Corporation Category: Common Mode Chokes Part number: MCZ1210AH900L2TA0G Package: 0504 (1210 Metric), 4 Lead RFQ verification required

Key Parameters

Part NumberMCZ1210AH900L2TA0G
ManufacturerTDK Corporation
CategoryCommon Mode Chokes
package0504 (1210 Metric), 4 Lead
seriesMCZ-AH
packagingTape & Reel (TR)
product statusActive
param 1Signal Line
param 22
param 390 Ohms @ 100 MHz
param 4-
param 5100mA
param 61.75Ohm
param 75V
param 8-
param 9-40°C ~ 85°C
param 10-
param 11-
param 12-
param 13-
param 14-
param 15Surface Mount
param 160.049" L x 0.039" W (1.25mm x 1.00mm)
param 170.024" (0.60mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MCZ1210AH900L2TA0G Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MCZ1210AH900L2TA0G, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.