TE Connectivity Aerospace, Defense and Marine 342A138-25/225-0
HEATSHRNK BOOT BRKOUT 45DEG SZ38
Answer first: this page is a purchasing reference for the exact part number 342A138-25/225-0 from TE Connectivity Aerospace, Defense and Marine. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 342A138-25/225-0 |
|---|---|
| Manufacturer | TE Connectivity Aerospace, Defense and Marine |
| Category | Heat Shrink Boots, Caps |
| series | Thermofit 342A1 |
| packaging | Bulk |
| product status | Active |
| param 1 | Boot, Transition - Side Breakout, 45° |
| param 2 | 38 |
| param 3 | Adhesive Coating, Fluid Resistant |
| param 4 | Black |
| param 5 | Elastomer, Semi-Rigid |
| param 6 | 2.189" (55.60mm) |
| param 7 | 1.000" (25.40mm) |
| param 8 | 1.060" (26.92mm) |
| param 9 | 0.488" (12.40mm) |
| param 10 | 3.760" (95.50mm) |
| param 11 | 3.402" (86.41mm) |
| param 12 | - |
| param 13 | 7.209" (183.11mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 342A138-25/225-0 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 342A138-25/225-0, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.