Home / Products / Power Entry Modules (PEM) / TE Connectivity Corcom Filters / 3EBF1

TE Connectivity Corcom Filters 3EBF1

PWR ENT RCPT IEC320-C14 PANEL QC

Answer first: this page is a purchasing reference for the exact part number 3EBF1 from TE Connectivity Corcom Filters. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: TE Connectivity Corcom Filters Category: Power Entry Modules (PEM) Part number: 3EBF1 Package: RFQ verification required

Key Parameters

Part Number3EBF1
ManufacturerTE Connectivity Corcom Filters
CategoryPower Entry Modules (PEM)
seriesEBF, Corcom
packagingBulk
product statusActive
param 1IEC 320-C14
param 2Receptacle, Male Blades
param 33A
param 4120/250VAC
param 53
param 6Filtered (EMI, RFI) - Commercial
param 73A
param 8-
param 9-
param 10No
param 11Panel Mount, Flange
param 12Quick Connect - 0.250" (6.3mm)
param 13-
param 14-
param 15Rectangular - 35.56mm x 25.65mm
param 16-
param 17-
param 18-
param 19CSA, UL, VDE

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 3EBF1 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 3EBF1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.