TE Connectivity Corcom Filters 6609073-2
LINE FILTER 30A CHASSIS MOUNT
Answer first: this page is a purchasing reference for the exact part number 6609073-2 from TE Connectivity Corcom Filters. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 6609073-2 |
|---|---|
| Manufacturer | TE Connectivity Corcom Filters |
| Category | Power Line Filter Modules |
| series | A |
| packaging | Bulk |
| product status | Last Time Buy |
| param 1 | Three Phase (Wye) |
| param 2 | Two Stage |
| param 3 | - |
| param 4 | - |
| param 5 | 250 V |
| param 6 | 440 V |
| param 7 | 30 A |
| param 8 | 50/60Hz |
| param 9 | General Purpose |
| param 10 | CSA, UL, VDE |
| param 11 | -10°C ~ 40°C |
| param 12 | Chassis Mount |
| param 13 | Threaded Post (1/4-20) |
| param 14 | 3.32mH |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 6609073-2 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 6609073-2, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.