Home / Products / Power Transformers / Triad Magnetics / VPT230-2170

Triad Magnetics VPT230-2170

PWR XFMR TOROIDAL 500VA CHAS MT

Answer first: this page is a purchasing reference for the exact part number VPT230-2170 from Triad Magnetics. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Triad Magnetics Category: Power Transformers Part number: VPT230-2170 Package: RFQ verification required

Key Parameters

Part NumberVPT230-2170
ManufacturerTriad Magnetics
CategoryPower Transformers
seriesChassis Mount: World Series™
packagingBox
product statusActive
param 1Toroidal
param 2115V, 230V
param 3Parallel 115V, Series 230V
param 4Parallel 4.34A, Series 2.17A
param 5Dual
param 6Dual
param 7No
param 8500VA
param 9Chassis Mount
param 10Wire Leads
param 11140.00mm Dia x 60.00mm W
param 1266.0mm
param 134000Vrms
param 149.3 lbs (4.2 kg)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify VPT230-2170 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For VPT230-2170, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.