Home / Products / Uninterruptible Power Supply (UPS) Systems / Tripp Lite / SU2000LCD1U

Tripp Lite SU2000LCD1U

120V 2000VA 1600W DOUBLE-CONVERS

Answer first: this page is a purchasing reference for the exact part number SU2000LCD1U from Tripp Lite. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Tripp Lite Category: Uninterruptible Power Supply (UPS) Systems Part number: SU2000LCD1U Package: RFQ verification required

Key Parameters

Part NumberSU2000LCD1U
ManufacturerTripp Lite
CategoryUninterruptible Power Supply (UPS) Systems
series-
packagingBox
product statusActive
param 1Online (Double Conversion)
param 2100VAC, 120VAC, 127VAC
param 3Desktop, Home Theater
param 4Rackmount
param 52kVA / 1600W
param 65 (UPS)
param 73 minutes
param 8RS-232
param 9100V, 120V, 127V
param 10NEMA 5-20P
param 11NEMA 5-15/20R (5)
param 125.9' (1.80m)
param 13CSA, FCC, NOM, UL
param 1427.950" L x 17.320" W (709.93mm x 439.93mm)
param 151.732" (44.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SU2000LCD1U Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SU2000LCD1U, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.