Home / Products / FETs, MOSFETs / Wolfspeed, Inc. / C3M0120065J

Wolfspeed, Inc. C3M0120065J

650V 120M SIC MOSFET

Answer first: this page is a purchasing reference for the exact part number C3M0120065J from Wolfspeed, Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Wolfspeed, Inc. Category: FETs, MOSFETs Part number: C3M0120065J Package: TO-263-8, D2PAK (7 Leads + Tab), TO-263CA RFQ verification required

Key Parameters

Part NumberC3M0120065J
ManufacturerWolfspeed, Inc.
CategoryFETs, MOSFETs
packageTO-263-8, D2PAK (7 Leads + Tab), TO-263CA
seriesC3M™
packagingTube
product statusLast Time Buy
param 1N-Channel
param 2SiCFET (Silicon Carbide)
param 3650 V
param 421A (Tc)
param 515V
param 6157mOhm @ 6.76A, 15V
param 73.6V @ 1.86mA
param 826 nC @ 15 V
param 9+19V, -8V
param 10640 pF @ 400 V
param 11-
param 1286W (Tc)
param 13-40°C ~ 175°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17TO-263-7

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify C3M0120065J Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For C3M0120065J, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.